All Systems Operational
Sites: 12/12 Online
▸ WAN Cost Savings
40%
vs. Legacy MPLS-only
▲ $284K/year saved
▸ Active Sites
12
Multi-region enterprise
▲ 2 sites added this quarter
▸ Avg. App Performance
98.4%
SLA adherence
▲ +11.2pp vs MPLS baseline
▸ Uptime (30d)
99.97%
Network availability
▲ 52min downtime avoided
Deployment Progress
On Track
85% Complete
Phase 1 — Core SitesDone
Phase 2 — Branch Roll-out92%
Phase 3 — Cloud Onramps67%
Phase 4 — Security Overlay40%
Technology Stack
🔷
Cisco SD-WAN
vManage / vSmart / vBond
Active
🌐
MPLS Hybrid
Tier-1 Carrier Links
Transitioning
☁️
Cloud On-Ramp
AWS / Azure / GCP
In Progress
Control PlaneCisco vManage 20.9
Overlay ProtocolOMP + IPSec/TLS
Underlay TransportMPLS + Internet + 4G LTE
RoutingBGP + OSPF
Security PolicyZero Trust Segmentation
QoS Classes8 Traffic Classes
EncryptionAES-256 Data Plane
Bandwidth Utilization
MPLS Link68% utilized
Internet Link42% utilized
LTE Backup3% utilized
Total Throughput14.7 Gbps
Peak Today18.2 Gbps
Application QoS
App ClassPolicyLatency
📞 Voice/UCPriority12ms
💻 SAP ERPPreferred22ms
☁️ SaaS O365Preferred18ms
🔒 Citrix VDIBest-Effort+34ms
🌐 General WebBest-Effort48ms
Recent Events
09:42:11[OK]HQ-vEdge-01 OMP session restored
09:38:55[INFO]Policy pushed to 12 vEdge devices
09:31:02[WARN]Dallas-BR3 MPLS link jitter >30ms
09:15:44[OK]Azure Cloud OnRamp tunnel UP
08:58:12[INFO]vSmart controller cert renewed
08:44:30[OK]NYC-DC failover test PASSED
08:22:07[INFO]BFD session established — LAX-BR1
07:55:00[OK]Backup LTE links health check OK
SD-WAN Logical Topology
— MPLS — Internet — Cloud
MPLS CORE NETWORK vMANAGE NMS Controller vSMART Primary vSMART Secondary vBOND Orchestrator vBOND Secondary HQ — San Antonio vEdge 8000 DC — New York vEdge 8000 Los Angeles Branch Dallas Branch Chicago Branch Atlanta Branch Cloud OnRamp AWS | Azure | GCP
Control Plane
vManageActive — Primary
vSmart Controllers2/2 Online
vBond Orchestrators2/2 Online
OMP Sessions24 Active
TLOCs36 Registered
Data Plane Stats
vEdge Devices12 Online
IPSec Tunnels48 Active
BFD Sessions96 Up
Transport LinksMPLS + Internet
Failovers (24h)0
Underlay Transports
MPLS CarrierAT&T / Zayo
MPLS Capacity10 Gbps
Internet CarrierComcast / Lumen
Internet Capacity40 Gbps
LTE BackupVerizon / T-Mobile
All Sites
12 Online
Site Detail — HQ San Antonio
Operational
99.99%
Uptime (30d)
12ms
Avg. Latency
DeviceCisco vEdge 8000 (x2)
Transport 1MPLS — 1Gbps AT&T
Transport 2Internet — 10Gbps
LTE BackupVerizon — Standby
VPNs Active8 Segments
Users Served~850
RoleHeadquarters / Hub
IPSec Tunnels11 Active
Policy TemplateHQ-Enterprise-v3
CPU28%
Memory41%
MPLS BW Used72%
▸ Avg WAN Latency
18ms
▼ -42ms vs MPLS baseline
▸ Packet Loss
0.01%
▼ -0.8pp improvement
▸ Jitter (avg)
2.4ms
▼ Within Voice SLA
▸ App Score (vAnalytics)
4.6/5
▲ +1.2 vs baseline
WAN Latency — 24h (ms)
— MPLS — Internet — LTE
60ms 40ms 20ms
00:0003:0006:0009:0012:0015:0018:0021:00Now
Application Performance by Site
SiteLatencyLossScoreStatus
San Antonio HQ12ms0.00%4.8Excellent
New York DC15ms0.00%4.7Excellent
Los Angeles22ms0.01%4.5Good
Chicago19ms0.01%4.6Good
Dallas Branch38ms0.05%3.9Degraded
Atlanta21ms0.01%4.5Good
Failover & Redundancy
Last Failover Event6 days ago
MTTR (failover)< 200ms
Active-Active LinksAll sites
BFD Detection Time1s
Path Selection PolicyApp-Aware Routing
Transport Failover Priority
1. MPLS (Primary)Active
2. Internet (Secondary)Active
3. LTE (Tertiary)Standby
▸ Annual WAN Spend (Before)
$710K
Legacy MPLS-only infrastructure
▸ Annual WAN Spend (After)
$426K
SD-WAN Hybrid model
▸ Net Savings / Year
$284K
▼ 40% cost reduction
▸ Project ROI
320%
18-month payback period
Cost Breakdown — Before vs After
MPLS Circuits
Before
$510K/yr
After
$228K/yr
Internet / Broadband
Before
$120K/yr
After
$144K/yr
Hardware & Licensing
Before
$80K/yr
After
$54K/yr
Savings by Category
MPLS Circuit Reduction$282K/yr
Reduced HW Maintenance$26K/yr
OpEx (NOC hours)$48K/yr
Downtime Avoidance$72K/yr
Added: Internet Links-$24K/yr
Added: SD-WAN Licensing-$120K/yr
Net Annual Saving
$284,000
40.0% reduction — exceeds target
Implementation Cost
$512K
Payback: ~21.6 months
Monthly Cost Trend
SD-WAN Go-Live
JanFebMarApr (GO-LIVE)MayJunJulAugSep
Deployment Timeline
Q1–Q4 2025
Jan 2025
Phase 0 — Assessment & Design
Network audit, site surveys, topology design, vendor selection (Cisco SD-WAN)
Feb 2025
Phase 1 — Control Plane Deployment
vManage, vSmart ×2, vBond ×2 deployed in private DC + cloud (AWS)
Mar 2025
Phase 2 — Core Site Migration
San Antonio HQ and New York DC migrated. Dual-stack MPLS + Internet active.
Apr–May 2025
Phase 3 — Branch Rollout (8 sites)
ZTP deployment to all branch offices. App-aware routing policies activated.
Jun–Aug 2025
Phase 4 — Cloud On-Ramp ← IN PROGRESS
AWS Direct Connect + Azure ExpressRoute integration. SaaS optimization live for O365.
Sep–Oct 2025
Phase 5 — Security Overlay
Zero-trust micro-segmentation, Umbrella SIG integration, SASE onboarding.
Nov 2025
Phase 6 — MPLS Decommission
Reduce MPLS to tier-1 only, terminate underutilized circuits. Full cost savings realized.
Dec 2025
Phase 7 — Optimization & Handoff
Performance tuning, runbook handover, NOC training, project closure.
Task Status
Total Tasks148
Completed112
In Progress24
Pending12
Blocked0
Overall Completion85%
Team
Project ManagerSarah Chen
Lead Network Eng.Marcus Williams
Cisco PartnerNetAxis Solutions
Security ArchitectPriya Nair
Cloud Eng.James Okafor
Risks
MPLS Carrier Delay
AT&T circuit upgrade delayed 3 weeks — Dallas circuit
Risk Level: Medium
Azure On-Ramp Quota
ExpressRoute quota increase request pending approval
Risk Level: Low
Budget On Track
Spend at 78% of $512K budget with 85% completion
Risk Level: Low
▸ Active Alerts
3
2 Warning, 1 Info
▸ Events (24h)
147
No critical events
▸ SIEM Integration
Live
Splunk + vAnalytics
Active Alerts
Dallas-BR3 — MPLS Jitter Elevated
Jitter measured at 38ms (threshold: 30ms). Traffic rerouting to Internet path.
09:31:02 — Auto-remediated via policy
LA-BR1 — Certificate Expiry in 14 days
vEdge device certificate requires renewal. Automated renewal job scheduled.
08:00:00 — Ticket #NET-2847 created
vManage — Software Update Available
Cisco SD-WAN 20.12.1 available. Maintenance window: Saturday 02:00–04:00.
06:00:00 — Change request pending
System Event Log
Live
09:42:11[OK]HQ-vEdge-01 OMP reconverged
09:38:55[INFO]Configuration template pushed — 12 devices
09:35:10[OK]BFD session restored — Dallas-BR3
09:31:02[WARN]Dallas-BR3 MPLS jitter >30ms — rerouting
09:15:44[OK]Azure Cloud OnRamp IKE tunnel established
09:10:22[INFO]Cisco vSmart: OMP route table updated
09:05:01[OK]LTE backup link health check — all OK
08:58:12[INFO]vSmart cert auto-renewed — 365 days
08:44:30[OK]NYC failover DR test PASSED — 180ms
08:22:07[INFO]New BFD session — LAX-BR1 ↔ HQ
07:55:00[OK]Daily device inventory sync complete
07:30:15[INFO]Flow telemetry export to Splunk — OK
Incident History (30 days)
DateSiteTypeDurationRoot CauseResolution
Mar 05Dallas BR3Degraded4m 12sMPLS jitter spikeAuto-reroute to Internet
Feb 28All SitesMaintenance45m 00sPlanned — vManage upgradeZero traffic impact
Feb 19LAX BR1Degraded2m 08sISP BGP flapFailover to MPLS + LTE
Feb 12NYC DCTestN/AScheduled DR TestPassed — 180ms failover
Feb 03ATL BR1Warning0m 00sCertificate near-expiryAuto-renewed via vManage